A small pain with an expensive tail
A cheap roofing quote might exclude the insulation, access equipment or a section of the specified work. Another might include them. Comparing the totals alone does not tell you which is better value.
The pain is not just the spreadsheet. It is the time spent switching between quotes, checking what each line means and chasing the missing answers. Leave those questions until after award and the same gaps can turn into variations, delays and disagreements.
What the tool brings into view
- Scope coverage: which lines are priced, included or provisional, and which remain gaps. Coverage is not proof that the work meets the specification.
- Missing scope: exclusions, blank or qualified entries, and lines nobody has priced.
- Price and quantity differences: unusual line prices and changed quantities that deserve a question, not an automatic rejection.
- A common GST basis: inclusive and exclusive quotes are compared as ex-GST figures.
- Totals that need checking: differences between the stated quote and the sum of the entered line prices.
- Indicative gap-adjusted totals: a view of how the comparison changes when estimable gaps are added.
Work one trade at a time, with up to 5 subcontractors and 150 BOQ lines. Start with “Load example” to explore the roofing comparison without using your own prices.
The roofing example report compares four subs across ten scope lines. It includes the price summary, eight alarms, a detailed leveller and the questions to resolve before award. Sub B starts at $95,700 and moves to an indicative $111,100 after estimable gaps are added — with the plant platform and cranage still unresolved.
How to run a useful comparison
- 01
Start with the scope, not the cheapest total
Choose one trade. Paste your bill of quantities (BOQ) from Excel using Item ref, Description, Qty and Unit. Check the loaded rows, or add and edit them yourself. The BOQ is your common reference for every quote.
- 02
Give each sub the same pricing schedule
Download the Excel RFQ pricing template once your BOQ is loaded. Ask each subcontractor to price against those lines. You can compare existing quotes too, but you must align their prices to your BOQ yourself. This free tool does not automatically match differently worded scope.
- 03
Add the quotes without hiding the gaps
Add at least two subcontractors. Paste one line total per BOQ row, in the same order, keeping blank rows in place. These are line totals, not unit rates. Select each quote's GST basis and add its stated total if available. Add different quantities where the sub has changed them.
- 04
Keep qualifications visible
Use entries such as incl, excl, by others, PS 5000 or TBC where those reflect the quote. Resolve any unrecognised entries using the status selector. A lump-sum-only quote can be entered, but without a breakdown the tool cannot measure its scope coverage.
- 05
Review the comparison and ask better questions
Read the summary, alarms and line-by-line leveller together. Check missing scope, provisional sums, quantities, unusual prices and differences between the stated and calculated totals. Sort by quoted or indicative adjusted total to see whether the order changes.
- 06
Clarify, update and keep the record
Send the relevant questions back to each sub. Update their entries when they respond, then review again. Print or save the comparison as a PDF, download a CSV, or copy the summary for your own correspondence. Export before closing or refreshing the page.
The adjusted total is a question, not an award price
The tool estimates eligible gaps using the median of other subcontractors' prices for the same BOQ line. By default, it needs at least two other priced references. That makes three quotes useful when you want gap estimates, even though two are enough to begin comparing.
If there are not enough references, the gap remains unestimated. It is not free work. An adjusted total that excludes unestimated items is still incomplete. Provisional sums are allowances, and “included” still needs checking against the actual quote.
Red, orange and yellow alarms help you decide what to investigate first. Green does not mean approved, compliant or safe to award. Confirm scope, specification, capability, programme and commercial terms with the sub. The tool supports your judgement; it does not replace it.
Where “More time to shine” fits
We do not want good people spending their day untangling the same paperwork. We want their experience being used where it counts.
For an estimator, that means more time understanding the job and testing assumptions. For a builder, it means clearer conversations with subcontractors and fewer surprises to resolve. For the team, it means a comparison they can discuss rather than a pile of separate documents.
That is “More time to shine” in practice. Take away the repetitive comparison work. Keep the thinking, relationships and decisions with the people who know the job. One small pain solved, without making you rebuild your business around another system.
Your prices stay with you
The comparison runs in your browser. No login is needed. Your BOQ, subcontractor names and prices are not saved to our systems or sent for AI processing. Anonymous usage events tell us whether the tool is used; they do not contain your quote data.
There is no saved comparison to return to after a refresh or closing the page. Export the results you need. Anything you choose to email or share from those exports is your decision.
Start small. Go further if you need to.
Use the free tool for a single-trade check. For the full tender-to-package-award system, explore Fair Dinkum ConstructIQ. If the pain is simply keeping up with the inbox, look at Inbox Dozer instead.